Valves, Fittings & Piping Hardware contact@mail.sowinglobal.com

Contact Us

Good Connections
Start with a Conversation.

Clear communication starts with a clear understanding of the requirements. For product questions, project inquiries or after-sales support, contact the team by email.

Business & Project Inquiries

  • Product Inquiries
  • Project Sourcing
  • Procurement Inquiries
  • After-Sales Support

Start with These Four Details

Model numbers, drawings and parts lists help clarify product requirements and confirm compatibility.

01Material
Stainless Steel / Brass / Carbon Steel
02Connections
Male & Female Threads / Thread Standards
03Operating Conditions
Media / Temperature / Pressure
04Order Details
Quantity / Required Delivery Date / Destination
Illustrative close-up of threads and machining texture on a stainless steel fitting
Let’s Connect.

Precision Valves & Piping Hardware
SOWIN HARDWARE SYSTEMS

FAQ

Frequently Asked Questions

Answers to common questions about product selection and ordering.

Ordering Process
What information is needed for a product inquiry?

A product inquiry should include the product name, material, connection size, thread standard, quantity and delivery location. Application-specific inquiries should also identify the fluid or gas, operating temperature and pressure. Product photos, drawings or parts lists may be attached to the email.

What if the connection type or material is uncertain?

Application details, photos of existing parts and measurements provide a starting point. Selection requires checking the material, male or female ends, connection size and thread standard on both mating components. Suitability should be confirmed against the relevant product specifications.

How are pricing, minimum order quantities and lead times confirmed?

Pricing, minimum order quantities and lead times depend on the product, specifications, quantity and delivery requirements. These details can be emailed to the sales team for confirmation of pricing and availability.

Can one inquiry cover multiple products for a project?

Yes. Valves, fittings and piping hardware can all be included in one list, with priority items clearly marked. A follow-up discussion can help confirm which items are available, along with pricing and delivery details.